AGENDA CITY OF SANTA MONICA ARCHITECTURAL REVIEW BOARD REGULAR MEETING VIA
TELECONFERENCE PURSUANT TO EXECUTIVE ORDER
N-29-20 ISSUED BY GOVERNOR GAVIN NEWSOM MONDAY, MARCH 15, 2021 7:00 PM |
PLEASE TAKE NOTICE to reduce the risk of spreading
Coronavirus (COVID-19), members of the Architectural Review Board, Applicants,
and City Staff will all participate via teleconference.
The meeting can be accessed at https://primetime.bluejeans.com/a2m/live-event/jtxukzcu
(Chrome browser
recommended) or by dialing in at +1 (415) 466-7000
(US) PIN: 6615011 #.
Those
wishing to give public comment may do so by emailing planningcomment@smgov.net.
Please note the agenda item in your comments. Comments received later than noon
the day of the meeting will be read into the record by the Board secretary on
behalf of the public (with time limitations) and must be received prior
to the Board’s consideration of the item. Comments received prior to noon the
day of the meeting will be distributed to the Board and posted online.
1.
CALL
TO ORDER
2.
ROLL
CALL
3.
SECRETARY’S
REPORT
Provided by Design
and Historic Preservation Planner
4.
APPROVAL
OF MINUTES:
·
None
5.
PUBLIC
HEARINGS AND INPUT:
The opportunity exists for any member of
the public to address the Board and comment on any subject not on
this agenda that is within the subject matter and jurisdiction of the
Architectural Review Board. Comments must be sent to planningcomment@smgov.net prior to the hearing in order to be read
into the record.
6.
EX
PARTE COMMUNICATION
7.
REVIEWS:
Public Input Permitted
A.
CONSENT
CALENDAR:
a.
Resubmission:
7.1 20ARB-0324: 2919 Wilshire Boulevard: Mixed-Use
Review the façade remodel, colors,
materials, landscaping plan, lighting plan, sign plans and a sign program for a
new commercial multi-tenant building.
Applicant’s Submittal Material
b.
New
Submissions
7.2 21ARB-0006
& 0007: 858-860 3rd Street:
Landscape
Review the
landscape plans for the adjacent multi-unit buildings at 858-860 3rd Street.
Applicant’s Submittal Material
7.3 21ARB-0009:
1814 Euclid: Multi-Unit Residential *
Review the design, colors, materials, and landscape plans for
the construction of three detached dwelling units totaling approximately 2,000
SF with uncovered parking.
Applicant’s Submittal Material
B.
REGULAR CALENDAR:
a. Resubmission: None.
b.
New Submissions:
7.4 20ARB-0323: 1510 Franklin:
Multi-Unit Residential
Review the design, colors, materials, and
landscape plans for the construction of a new two-story, three-unit condominium
development totaling 6,890 square feet with covered parking.
Applicant’s Submittal Material
7.5 21ARB-0039: 1427-1431
Lincoln Blvd: Mixed-Use
Review building design,
colors, materials, and landscape plans for a new Tier 2 five-story, 50-foot
high, approximately 33,744 square-foot, mixed-use building consisting of two
ground floor retail/commercial tenant spaces and 30 upper level residential
dwelling units situated over a 30-space subterranean parking garage.
Applicant’s Submittal Material
8.
PRELIMINARY
REVIEW: None.
9.
REFERRALS
TO STAFF
10.
ADJOURNMENT
* Noted properties are listed on the City of Santa Monica Inventory of
Historic Resources
** Noted properties
are forty (40) years or older and in an area of the City where the Inventory of
Historic Resources was updated more than 5 years ago
*** Noted properties have been
identified as having a Meritorious Sign on the site
ARCHITECTURAL
REVIEW BOARD
Therese Kelly,
Chairperson
Patrick Tighe,
Vice-Chair
Barbara
Coffman, Board Member
Kevin Daly,
Board Member
Craig Hamilton,
Board Member
Barbara Kaplan,
Board Member
Joshua Rosen,
Board Member
CITY STAFF
Stephanie
Reich, Design & Historic Preservation Planner
James Combs, Associate
Planner, Liaison to the Board
Melissa Zak,
Staff Assistant
Note: For each item the Board will approve, approve with conditions, disapprove or ask for a submission of a redesign on a voluntary basis (continuance). A submission of a redesign requires no additional filing fee. Notification of the decision of the Board will be mailed to the applicant. All decisions of the Board can be appealed to the Planning Commission during the 10-day appeal period following the decision date. Such an appeal must be made by completing and submitting an appeal form available at the Planning Public Counter, Room 111, in City Hall within the appeal period. The appeal filing fee is $539.57 and must accompany the appeal form.
Following Board action on your project, you will be
mailed a Statement of Official Action (STOA) that details the findings
made by the Board and any conditions of approval. You will attest by signature to the
following:
“I hereby acknowledge that the Building,
Design, Colors, and Materials [or sign
program and sign plans] are as specified in the final application submittal
and as approved by the Architectural Review Board, or Planning Commission on
appeal, are the approved plans. Deviations
from the approved plans, including, but not limited to any aspect of the
design, colors, materials, finish, features, equipment, or signs requires the
prior approval of the Architectural Review Board. Minor deviations may be
approved by staff in accordance with Architectural Review Board Resolutions. I
agree to have the construction plans prepared in compliance with all pertinent
details of the ARB approved plans. In the event of a conflict, the ARB
approved Plans shall prevail over the construction plans. I further acknowledge that failure to
construct the project pursuant to the ARB approved plans is grounds for
withholding final inspection and occupancy until such discrepancy(s) are
resolved."
This agenda is subject to change up to 72 hours
prior to a regular meeting and 24 hours prior to a special. Please check the agenda for prior to
the meeting for changes.
PUBLIC
COMMENT: During
teleconference meetings, members of the public may email their comments to planningcomment@smgov.net. Comments will be read into the record
by the Board secretary on behalf of the public, with a reading time limit in
accordance with Board rules. All requests to address the Board on public
hearing items must be submitted prior to the Board’s consideration of
the item.
CONSENT
CALENDAR items will be
acted upon by the Board at one time without discussion unless a Board member
requests discussion on an item or a member of the
public has submitted a request to speak on an item. If such a request is made, the item will be
heard after the balance of the Consent Calendar has been voted upon.
HEARING
PROCEDURES on each item
include presentation of the staff report; Board questions of staff, if any; a
two minute presentation by the project applicant on the merits of the proposed
design; Board questions of the applicant, if any; two minutes for each member
of the public wishing to speak to the item; two minutes for applicant to rebut,
clarify, or answer questions or criticism raised in public comment, if any;
followed by Board deliberations and decision.
ACTION
BY THE ARCHITECTURAL REVIEW BOARD
on most matters occurs with votes of at least four Board members on a motion to
approve, approve with conditions, or disapprove a proposal (at least four (4) affirmative
votes are required for approval).
APPEALS:
Certain actions of the Board can be appealed to the Planning Commission
within 10 days of the decision. For specific information on appeals, please
contact the City Planning Division.
Any documents produced by the City and distributed to a
majority of the Architectural Review Board regarding any item on this agenda
will be made available at https://www.smgov.net/Departments/PCD/Boards-Commissions/Architectural-Review-Board/
COPYRIGHT
DISCLOSURE AND FAIR USE COMMITMENT FOR COPIES OF ARCHITECTURAL PLANS
ARCHITECTURAL
PLANS ARE SUBJECT TO COPYRIGHT PROTECTION UNDER STATE AND FEDERAL LAW.
UNAUTHORIZED USE OF COPYRIGHTED MATERIAL MAY RESULT IN A VIOLATION OF FEDERAL
LAW, 17 USC § 501.
The City of Santa Monica provides copies
of architectural plans that are submitted to the City in the course of the
design review or land use approval process in order to comply with state public
disclosure laws. The City provides copies of these architectural plans for the
purpose of facilitating project review, public comment, and news reporting
consistent with the doctrine of fair use. Any further use or publication of
architectural plans without the permission of the copyright owner may
constitute an infringement of applicable copyright projections.
By clicking on the links to access draft
plans, you are (1) acknowledging the existence of copyright protection for
architectural plans; (2) recognizing that the use of such plans is limited by
the copyright protection; and (3) represent that you do not intend to use the
copies in any manner that would infringe upon the copyright.
For more information regarding the
Architectural Review Board agenda, please contact the City Planning Division at
planning@smgov.net
If you need any
disability-related accommodations, including assistive listening devices or
interpreters and readers, please contact the City Planning Division at (310)
458-8341 or planning@smgov.net at least three days prior to the meeting. This
document is available in an alternate format upon request.