Phases 4A and 4B of the Advanced Traffic Management System (ATMS) Project connected 40 signal-controlled intersections along Arizona Avenue, the Office District on Ocean Park Boulevard, and Mid-City areas to the City’s centralized control system with fiber optic cables.  The project included installation of new conduit and modification of the existing interconnected conduit system to accommodate fiber optic cable.  Upgrades to traffic signal infrastructure rangde from a full replacement of all the traffic signal equipment to less extensive upgrades such as the installation of new controller cabinet and video detection and/or video surveillance cameras.

Construction began in January 2012 and was completed in February 2013.

  

Know Before You Go

Construction on this project is complete.

Project Videos

Comments and Concerns

We want to hear from you. To ask a question, share a concern, or give input 24/7, GO (Government Outreach System) logouse our GO System

SMAlerts_bugSM Alerts

Stay Informed: Sign up for email and text messages about this project.

Estimated Project Timeline

timeline thumbnail
Project Timeline >>>

Other Resources

Project Contacts

24-Hour Project Hotline (866) 755-7679

Mark Verrengia, Construction Manager, 714-865-4005 Psomas

Hany Demitri, Civil Engineer, 310-458-2201 ext. 5385 City of Santa Monica

1685 Main St., Santa Monica, CA 90401 · (310) 458-8411 · TTY (310) 917-6626