Search Backing Santa Monica PublicWorks Civil Engineering
Public Works Home

Please email us at the addresses below and we will reply within 1-2 business days.

Main Engineering Office
1685 Main Street, Mail Stop 15
Santa Monica, CA 90401
E-mail: sm.engineering@smgov.net

Engineering Permit Center
1685 Main Street, City Hall East 1st Floor
Santa Monica, CA 90401
E-mail: pw.permits@smgov.net

Street Services
2500 Michigan Avenue
Santa Monica, CA 90404
E-mailstreets.mailbox@smgov.net

Hours
Mon – Thurs, 8 AM to 5 PM
Alternating Fridays, 8 AM to 5 PM
Click here to see which Fridays City Hall is open

 

 

 

 
Go Santa Monica

Annual Paving Program

 

     Upcoming Paving 02/22/21 - 01/22/22

Click here to view construction notice 

The City of Santa Monica’s pavement assets include approximately 155 centerline miles of roadway. The City’s Engineering Division implements an annual paving program to maintain and improve the City’s roadways for the safety of the traveling public.    

Each year, the Engineering Division inspects the roadways and identifies those streets that require repair or reconstruction. To facilitate coordination with other projects and minimize impacts to residents the City has adopted a zone-based system for the annual paving program. During inspection the condition of the pavement is evaluated and measured using a pavement condition index rating system. This approach assigns a numerical rating to each section of road being evaluated for the presence of various distresses and the severity level of each distress (low, medium, high). A database program tracks the pavement condition and the history of maintenance of every roadway section.

As a result of a proactive pavement maintenance strategy and adequate funding, the average condition of the street pavement in the City is very good.  Over the last five years, Santa Monica has maintained an average Pavement Condition Index (PCI) of 82. The City’s stated PCI goal is 80.

Note 

Per Excavation Requirements from the Santa Monica Municipal Code (07.06.330(e))

Excavation in Recently Paved Streets. Except in an emergency or in the case of a new service connections to a newly constructed or substantially remodeled building, there shall be no excavation in streets completely resurfaced or reconstructed by the City within the proceeding three years.  

Links

Frequently Asked Questions (FAQ)
Pavement Maintenance Strategies
Contacts  

    

Annual Paving Program Map
Annual Paving 19-20 Map - Image

Click on the image to download a pdf version
of the Annual Paving Program Map. 

Maps of recently completed paving projects: 
Fiscal Year 2019-2020 Paving (In Progress)
 Fiscal Year 2018-2019 Paving 

 

 Pavement Maintenance Strategies

 

City of Santa Monica © 2021

1685 Main St, Santa Monica, CA 90401