Search Backing Santa Monica PublicWorks Civil Engineering
Public Works Home

*PLEASE NOTE: Our Offices are Temporarily Closed to the Public Due to COVID-19*

Please email us at the addresses below and we will reply within 1-2 business days.

Main Engineering Office
1685 Main Street, Mail Stop 15
Santa Monica, CA 90401
E-mail: sm.engineering@smgov.net

Permit Center
1685 Main Street, City Hall East 1st Floor
Santa Monica, CA 90401
E-mail: pwpermits@smgov.net

Street Services
2500 Michigan Avenue
Santa Monica, CA 90404
E-mail: streets.mailbox@smgov.net

Hours
Mon – Thurs, 8 AM to 5 PM
Alternating Fridays, 8 AM to 5 PM
Click here to see which Fridays City Hall is open

 

Go Santa Monica
   

Pier Storm Drain Improvements

 
The Santa Monica Pier water quality has been subject to high bacteria levels, which has led to beach closures.  Studies have shown that the Pier Storm Drain is a major cause of elevated bacterial concentrations.   In response, the City initiated the Pier Storm Drain Improvement project. 
 


Pier Storm Drain 1
 
Pier Storm Drain Outlet
prior to Construction
 

  This project performed major repairs to the size of the existing Pier Storm drain diversion to the sewer for flows that exceed the capacity of the Santa Monica Urban Runoff Recycling Facility, and replace the deficient storm drain under the Pier to reduce runoff flows onto the beach.
 

Pier Storm Drain 2
 
Pier Storm Drain Outlet
after Construction