2930 Colorado Ave Village Trailer Park EIR The proposed project would involve the partial closure of the existing Village Trailer Park and development of a 341,390-square-foot mixed-use project at 2930 Colorado Avenue. Specifically, the proposed project would retain the easternmost portion of the existing Village Trailer Park located on Parcel No. 4268-002-006 (comprising approximately 14,400 square feet), which would allow for 10 mobile home spaces to remain. The remaining portion of the existing Village Trailer Park consisting of 99 spaces would be closed and redeveloped with three new buildings that would result in a 341,290 square foot mixed-use development. The project’s 24,940 square feet of neighborhood serving retail would be located on the ground level fronting Colorado Avenue, New Road, and Pennsylvania Avenue extension to create an active street frontage. The residential uses would include 161 apartment units and 216 condominium units. Notwithstanding the number of mobile home spaces to be removed, 99 of the apartment units would be rent-controlled. A portion of the apartments would be made available to current Village Trailer Park tenants as part of the relocation plan for the proposed project. Documents Final Environmental Impact Report - Monday Nov 12, 2012 Village Trailer Park Revised Final Environmental Impact Report 1.0 Introduction to the Revised Final EIR 2.0 Corrections and Additions 3.0 Response to Comments from Persons and Organizations Consulted Village Trailer Park Recirculated Environmental Impact Report 1.0 Introduction 2.0 Summary 3.0 Project Description 4.1 Aesthetics Initial Study Appendix P Draft Environmental Impact Report - Friday Aug 31, 2012 The Draft EIR comment period is 45 days as required by CEQA Guidelines Section 15105. Comments may be submitted, in writing, by 5:30 PM on Monday Oct 15, 2012 Village Trailer Park Recirculated Environmental Impact Report 1.0 Introduction 2.0 Summary 3.0 Project Description 4.1 Aesthetics - recirculated Initial Study Appendix P Final Environmental Impact Report - Monday Apr 23, 2012 Village Trailer Park Final Environmental Impact Report Volume I: Village Trailer Park Table of Contents 1.0 Introduction 2.0 Summary 3.0 Project Description 4.0 Environmental Impacts 4.1 Aesthetics 4.2 Air Quality 4.3 Biological Resources 4.4 Construction Effects 4.5 Cultural Resources 4.6 Geology and Soils 4.7 GreenhouseGas 4.8 Hazards and Hazardous Materials 4.9 Hydrology and Water Quality 4.10 Land Use and Planning 4.11 Neighborhood Effects 4.12 Noise 4.13 Population and Housing 4.14 Public Services Recreation 4.15 Transportation and Traffic 4.16 Utilities and Service Systems 5.0 Alternatives 6.0 Other CEQA Sections 7.0 Persons and Sources Consulted 8.0 Introduction to the Final EIR 9.0 Response to Comments Volume II: Village Trailer Park Appendices Appendix A - Initial Study Appendix B - Notice of Preparation Appendix C - Air Quality Calculations Appendix D - Tree Inventory Appendix E - Hydrology Calculations Appendix F - Traffic Study Appendix G - Noise Calculations Volume III: Village Trailer Park Appendices Appendix H - Draft EIR Comment Letters Appendix I - Landmarks Commission Report Appendix J - Phase 1 ESA Appendix K - Reduced Project Alternative Analysis Appendix L - Air Quality Appendix M - Santa Monica LUCE Model Development Report Appendix N - SCS Information Packet Appendix O - Signal Warrants Draft Environmental Impact Report - Friday Oct 14, 2011 The Draft EIR comment period is 45 days as required by CEQA Guidelines Section 15105. Comments may be submitted, in writing, by 5:30 PM on Monday Nov 28, 2011 Village Trailer Park Draft Environmental Impact Report Volume I: Village Trailer Park Table of Contents 1.0 Introduction 2.0 Summary 3.0 Project Description 4.0 Environmental Impacts 4.1 Aesthetics 4.2 Air Quality 4.3 Biological Resources 4.4 Construction Effects 4.5 Cultural Resources 4.6 Geology and Soils 4.7 GreenhouseGas 4.8 Hazards and Hazardous Materials 4.9 Hydrology and Water Quality 4.10 Land Use and Planning 4.11 Neighborhood Effects 4.12 Noise 4.13 Population and Housing 4.14 Public Services Recreation 4.15 Traffic and Transportation 10.10 4.16 Utilities and Service Systems 5.0 Alternatives 6.0 Other CEQA Sections 7.0 Persons and Sources Consulted Volume II: Village Trailer Park Appendicies A. Initial Study B. Notice of Preparation - City revised C. Air Quality Calculations D. Tree Inventory E. Hydrology Calculations F. Traffic Study G. Noise Calculations Notice of Preparation (NOP) - Thursday Jun 10, 2010 The NOP comment period is 30 days as required by CEQA Guidelines Section 15082. Comments may be submitted, in writing, by 5:30 PM on Saturday Jul 10, 2010 Village Trailer Park Notice of Preparation