1633 26th Street Project EIR The project would consist of the refurbishment of the project site’s existing three story, 45,529 square feet (sf) office building, and replacement of the existing 58,940 sf surface parking lot with two new four‐story, creative and/or business professional office buildings. The proposed new buildings (Buildings A and B) would comprise a total of 129,265 sf of new floor area building (Building C) rising to a maximum height of 54 feet. Together, the three buildings would total approximately 174,684 sf and would form a campus-like area leaving open space in the middle as a courtyard. The approximately 10,436 sf courtyard would feature a large mature specimen tree that would be a focal point of the open space. The project would also include a three level subterranean garage with 399 parking spaces with access provided from Pennsylvania Avenue. The project would require a Development Review Permit. Documents Draft Environmental Impact Report - Thursday Nov 19, 2020 The Draft EIR is published for a 60 day review period, exceeding the 45 days required by CEQA Guidelines Section 15105. Comments may be submitted, in writing, by 5:30 PM on Monday Jan 18, 2021 1633 26th Street Office Project Draft EIR Volume 1 Executive Summary II. Project Description III. Environmental Setting IV.A Air Quality IV.B Energy IV.C Greenhouse Gas Emissions IV.D Hazards IV.E Land Use IV.F Noise IV.G Transportation IV.H Tribal Resources V. Other CEQA Considerations VI. Alternatives VII. Effects found not Significant VIII. Preparers of EIR IX. Acronyms X. References 1633 26th Street Office Project Draft EIR Appendix Volume 2 Appendix A NOP and Initial Study Appendix B NOP Comment Letters Appendix C Air Quality and Greenhouse Gas Emissions Analysis Appendix D Energy Data Appendix E Cultural Resources Info Appendix F Geotechnical Report 1633 26th Street Office Project Draft EIR Appendix Volume 3 Appendix G Hazards Appendix H Noise Data Appendix I Transportation Report Appendix J Tribal Resources Info Appendix K Utilities Info Notice of Preparation (NOP) - Wednesday May 06, 2020 In consideration of the current Coronavirus (COVID19) pandemic, the NOP comment period is 60 days exceeding the minimum 30 days as required by CEQA Guidelines Section 15082. Comments may be submitted, in writing, by 5:30 PM on Monday Jul 06, 2020 NOP 1633 26th Street Office Project NOP 1633 26th St Rachel Kwok, Environmental Planner Figure 1, Regional Location Map Figure 2, Project Site Location Figure 3, Project Site Plan Figure 4, Project Rendering