|
#1. |
Q: How can I
submit a proposal for the space? |
|
|
A: Proposals
can be delivered by mail or
by hand to:
Attn: Civic Center
Restaurant RFP
Resource Management
Department
3223 Donald Douglas Loop S.
Suite 2
Santa Monica, CA 90405
Contact: Elana Buegoff at
(310) 458-8763 if you have
any questions.
|
|
#2. |
Q: What will the interior
finishes include? |
|
|
A: Concrete floors, block walls
and glass storefront.
|
|
#3. |
Q: Is there currently a floor
drain? |
|
|
A: The Operator will be
responsible for installing floor
drain and connecting to the
sewer line. The build out
contractor will need to core
through the concrete slab at the
location they need it and
reconnect to the sewer pipe. The
contractor shall x-ray prior to
core so as not to hit conduit,
rebar, etc. Core location shall
be approved by the building
structural engineer prior to
coring.
|
|
#4. |
Q: What electrical service is
provided? |
|
|
A: The City will provide 2
electrical sub panels, 2-3 phase
480V panels; and running
conduits to the panels.
|
|
#5. |
What plumbing service is
available? |
|
|
A: 2 ½” gas pipe; 2” cold water
pipe (domestic water); 1 ½”
reclaimed water pipe; area
drains provided on patio deck
area. The City will also provide
a general fire sprinkler system
that may need to be modified by
tenant depending on the tenant’s
architectural needs.
|
|
#6. |
What mechanical elements will
the City provide? |
|
|
A: Exhaust air louver; make-up
air intake; Large cut out for
kitchen hood range; piping
sleeves for tenant provided
HVAC; space on roof of parking
structure for tenant provided
HVAC; Telephone closet includes
conduit to tenant space for
phone and data lines.
|
|
#7. |
Q: What is the fee for the
public parking structure? |
|
|
A: The parking rates have not
been established for the 882
space structure, but will likely
be similar to other municipal
parking structures.
|
|
#8. |
Q: Can the Operator use patio
heaters? |
|
|
A: Yes, provided the heaters
meet with the approval of the
Santa Monica Fire Department.
|
|
#8. |
Q: Will the City provide Tenant
Improvement funds? |
|
|
A: The City is unable to provide
Tenant Improvement funds.
However depending on the level
of capital improvement proposed
by the selected Operator, a
generous rent credit/ rent
relief may be
considered.
|
|
#9. |
Q: How many
parking spaces are in the
structure and can I use these
spaces towards my required
parking? |
|
|
A: The structure
will have 882 parking spaces
which can count towards the
restaurant's required parking.
|
|
#10 |
Q. Will a
restaurant be required to get a
Conditional Use Permit (CUP)? |
|
|
A. Yes, all
restaurants within the Civic
Center District require a
Conditional Use Permit.
|
|
|
|