Contact Us
The Public Counter is open Monday through Thursday from 7:30 a.m. - 5:30 p.m. Fridays 8:00 a.m. - 5:00 p.m.
Building and Safety Fax: (310) 396-6473 Inspection Request Line: (310) 458-2202 Inspectors' Lines: (310) 458-2201 plus their extension Inspection Fax: (310) 458-2104 We are closed on these holidays: New Years Day, Dr. Martin Luther King Jr.'s Birthday, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the day after, Christmas Day
|
In addition to the inspections required by Section 108, some construction projects require that a deputy inspector verifies specific aspects of the construction and that the specifications conform to the approved drawings. The deputy inspector is required to report these observations in writing, on an approved special inspection report form to the building official at regular intervals.
Special (Deputy) Inspections are required for:
- Concrete Strength > 2,500 psi, Shotcrete
- Reinforcement in structural decks
- Drilled in Anchors
- Field Welding or Shop Welding in a non-approved fabricator shop (includes steel stud)
- High strength bolts
- Sprayed-on fire proofing
- Pilings – caissons
- Masonry
- Wood diaphrams and sheerwalls with nailing 3 inches on center or less
- Special cases as directed by the Building Official
Click here for a list of special (deputy) inspectors.
Please note:
- The Architect, Engineer, or Owner on a project is responsible for arranging for special inspections.
- Deputy inspectors must register with the City of Santa Monica Building and Safety Division prior to working in the City.
- Deputy Inspectors must have a valid City of Los Angeles Certification for the field of work to be inspected.
- An inspector registration form must be completed and accepted by the Division along with a fee of $295.48.
- The Division will need copies of the applicant's Photo ID and current LA City Certifications.
- The registration is valid for 2 years from date of payment. You will need to provide us with updated LA City certifications if yours expires.
- Deputy Inspectors must report to the Division either by phone or in person to be added to the building permit.
- Deputy Inspection reports WILL NOT be accepted if received from a non-registered deputy or if the deputy did not check in prior to reporting to the site.
|